This post is also available in:

Finally Nadya took the kids out for a walk, with the arrangement that while they were out I would set up the lights, cameras, and microphones and get on with the build, so they would not get in my way and I would not get in theirs.
Yes, but just as I finished setting up the lighting, it turned out that Nadya was feeling unwell and they were coming home. We agreed that I would wait for them, let them have lunch, drink some water, and generally use the kitchen as a kitchen, and only then would I start.
And that is what we did. Well — I did some building and almost met my minimum target. I did not even finish the whole logically separate first half of the step (the upper half of the instruction page) — one of the two mirrored assemblies! I still had D36+B77 and B75+B76 left to assemble, but perhaps it worked out better this way. I will be more careful in the second part!



Leave a Reply